The Bvlgari Resort Project

[section_header use_decoration=”1″ layout_type=”section-heading-polkadot-bottom” main_heading=”The Bvlgari Resort Project” text_align=”left”]

The Bvlgari Resort is located in one of the most breath taking scenery in the world, a veritable emblem of the tropical exoticism of the Orient, combining the breathtaking beauty of unspoiled nature with a sophisticated contemporary design born from the encounter between traditional Balinese forms and high Italian style. The quality of the services along with the views of the Indian Ocean offered by its magnificent position 150 meters over the sea are the perfect introduction to the second luxury property from Bvlgari Hotels & Resorts.

In August 2012, The Bvlgari Hotels & Resorts appointed PT Gapura Liqua Solutions for 7 years Build Operate Transfer (BOT) contract for a new 500 CMD total capacity of combined Seawater Reverse Osmosis (SWRO) and Brackish Water Reverse Osmosis (BWRO) system. The RO system used for the treatment of seawater from sea well and brackish water from ground water well. In this project, 1 (one) sea well and 2 (two) ground water well constructed to supply raw water need for the system. From sea well, the raw water transfer to SWRO housing, with distance 500 meter from the sea well. Please bear in mind the topographical is very challenging (80-85o inclination, 150 m height). The water then process using seawater reverse osmosis system to produce fresh water. After that, this product transferred to hotel fresh water tank, before distributed for hotel consumption.

The system will guarantee that the resort will always have quality water for their guests. This prove that difficult location, a real added value for the breathtaking view, but also can be engineering marvel has been done by GLS. Using the system, not only the hotel needs not to worry about the water supply and the quality, but also cost effective. The SWRO system is now under construction and on schedule to start production in earlier of February 2013.

The St Regis & The Laguna Bali Project

[section_header use_decoration=”1″ layout_type=”section-heading-polkadot-bottom” main_heading=”The St Regis & The Laguna Bali Project”]

The St. Regis and The Laguna Bali, a luxury resort in Bali and one of the most exclusive and beautiful destinations in the world with a beautiful beach at Nusa Dua.

Gapura Liqua Solutions is proud to be this beautiful resort’s partner in providing fresh water. Gapura Liqua Solutions investing on 450 CMD (Cubic Meter per Day) Sea Water Reverse Osmosis desalination system. While the hotel will compensate GLS based on the water consumption. At the end of the cooperation time, the system will belong to the hotel (Build, Operate, Transfer / BOT). The SWRO system used for the treatment of seawater from sea well. In this project, 2 (two) sea well constructed to supply raw water need for the system. From sea well, the raw water transfer to SWRO housing, which located 400 – 500 meter from the sea well. The water then process using seawater reverse osmosis system to produce fresh water. After that, the product is being transferred to the hotel’s fresh water reservoir, before distributed for hotel consumption.

Having their own Water Desalination System, the hotel does not have to worry about the water supply, also since using BOT Partnership GLS guaranteed the supply of fresh water all year round. The SWRO system is now under construction and on schedule to start production in earlier of January 2013.